Key Points and Conclusions from the FTB Water Resources Seminar

26 October, 2026

In September, FTB hosted its Water Resources Seminar at Pewterers’ Hall. It comprised four presentations followed by a panel discussion. This ELB post summarises the key points from the seminar.

Key Points and Conclusions from the FTB Water Resources Seminar

In September, FTB hosted its Water Resources Seminar at Pewterers’ Hall. It comprised four presentations followed by a panel discussion. This ELB post summarises the key points from the seminar.

Nuisance and regulation post-MSC2

James Pereira KC kicked off the seminar by noting a cultural shift in the legal system to recognise and embrace environmental values. That change is reflected in many areas of the law, but one such area is the law of private nuisance.

Private nuisance is an old tort created as a means of recognising property rights. That is reflected in the requirement that, to bring a claim, a person must have a proprietary interest in the land over which their enjoyment is said to have been unreasonably interfered with (Hunter v Canary Wharf Ltd [1997] AC 655). That requirement somewhat limits the scope of private nuisance as a means of challenging environmental degradation. However, following one particular case, a renaissance of nuisance is around the corner.

That case is Manchester Ship Canal Company Ltd v United Utilities Water Ltd (No.2) [2024] UKSC 22 (“MSC2”). It is now a couple of years old, but still relatively young in the legal world.

The facts of MSC2 are relatively straightforward. The Canal Company owns the beds and banks of the Manchester Ship Canal – a 36-mile-long canal that connects the Port of Liverpool directly to Greater Manchester. United Utilities (“UU”) is the statutory sewerage undertaker for the region, operating roughly 100 outfalls from which material emanating from sewers, sewage treatment works and pumping stations is discharged into the canal.

The dispute arose because of how UU’s sewerage system is designed. Where its hydraulic capacity is exceeded, foul water is discharged into the canal – which could be avoided if UU invested in improved infrastructure and treatment processes, [3]. The issue for the court was whether the Canal Company could bring a claim in nuisance or trespass when the canal is polluted by discharges of foul water, or whether it was instead barred by the statutory scheme for regulating sewerage under the Water Industry Act 1991.

The Court considered the law prior to privatisation. It considered that at common law the pollution of a watercourse is an actionable nuisance and may also constitute a trespass. The Court cited Lord Macnaghten in John Young & Co v Bankier Distillery Co [1893] AC 691, 698 who stated:

“Every riparian proprietor is thus entitled to the water of his stream, in its natural flow, without sensible diminution or increase and without sensible alteration in its character or quality.”

The Supreme Court found that the 1991 Act does not prevent the Canal Company from bringing a claim in nuisance or trespass when the canal is polluted by discharges of foul water from UU’s outfalls, even if there has been no negligence or deliberate misconduct, [128]–[130]. Part of its reasoning was that Parliament cannot be taken to have intended to authorise a nuisance that could be avoided, [18]. Indeed, Parliament has consistently made clear that it is not authorising the pollution of watercourses by sewage, [50(6)].

In terms of remedy, the Court accepted that if a court were to grant injunctions requiring a sewerage undertaker to spend large sums of money on new infrastructure as a remedy for private nuisance, that might disrupt the scheme under the 1991 Act, [128]. However the Supreme Court explained that a court could instead make an award in damages for past, future and/or repeated invasions of property rights, [129]–[131]. That would be a sticking plaster pending upgrades of the sewerage infrastructure.

The availability of an action in private nuisance is therefore a way for owners of waterways to directly challenge polluters of their waters.

That contrasts with the statutory nuisance regime under the Environmental Protection Act 1990 (“EPA”). Under s.79(1) of the EPA, where a person complains of a statutory nuisance to their local authority, the local authority is under a duty to take such steps as are reasonably practicable to investigate the complaint. Only the matters explicitly listed in s.79(1) can comprise statutory nuisances. Those particularly relevant to water owners might be “(a) any premises in such a state as to be prejudicial to health or a nuisance” or the more specific “(e) any accumulation or deposit which is prejudicial to health or a nuisance”. If a local authority is satisfied that a statutory nuisance is exists (or is likely to occur), it may issue an abatement notice; the notice may require the abatement of the nuisance, prohibit or restrict its occurrence/recurrence, or require the execution of works and taking of steps to achieve those purposes (s.80(1)).

Alternatively to complaining to one’s local authority, a “person … [who] is aggrieved by the existence of a statutory nuisance” may themselves make a complaint to a magistrates’ court. The court may then make an order with requirements substantively similar to an abatement notice.

So where does this leave us?

Under the statutory nuisance regime, a broad range of persons may complain to the local authority or a magistrates’ court to secure an abatement notice or order in relation to a statutory nuisance. However, the matter complained of must fit within the defined confines of a “statutory nuisance”. Where it does not, what can they do? Well, following MSC2 any person with a property interest in the bed and banks of an affected water body might have a claim in private nuisance. It is another arrow in their quiver – or another oar to their boat.

Is it a bird? Is it a plane? No, it’s super-regulator

Simon Tilling then took to the stage to discuss one particular theme in DEFRA’s February 2026 White Paper: a new water ‘super-regulator’.

The White Paper notes that there is a widespread consensus that the existing regulatory framework has been ineffective both in delivering for customers and the environment, and for creating the conditions for long-term investment. Therefore, the Government:

“… will create a powerful new regulator by abolishing Ofwat and bringing together the relevant water system functions from the existing regulators (Ofwat, the DWI, EA and Natural England) into one new body. This will replace the current fragmented system with one regulator capable of integrated management of the water system. It will be able to deliver better services for customers, joined-up regulation and a cleaner environment for nature and the public.”

The creation of a new integrated regulator was Recommendation 16 of the Independent Water Commission’s 2025 report.[1] Emma Reynolds MP in her role as Environment Secretary agreed with that recommendation. She explained that a Chief Engineer will sit inside the new regulator “to bring back the hands-on checks of water infrastructure Ofwat has failed to provide”, and the new regulator “will introduce an ‘MOT’ style approach for water company infrastructure, requiring health checks on pipes, pumps and more” rather than waiting for problems to arise and cause water shortages.[2]

The new super-regulator will regulate the water sector only – not the wider water system in general. Many questions remain over how it will operate:

  • Since 1996 the Environment Agency has watched over both waste and water. How does that look under the new water super-regulator? The White Paper says the new regulator will take over the EA’s “water regulator functions”. Does that mean waste and water will have to be treated as discrete issues? Is that possible?
  • Ofwat operates on a standards-based system, the Environment Agency (“EA”) deals in offences. How will the new super-regulator operate?
  • Andy Burnham is planning to create nine new regional bodies responsible for planning, setting objectives, and holding water companies to account.[3] How will they interact with the new national super-regulator?

Recent trends in water law and public law litigation

Charles Streeten then gave a whistle-stop tour of some recent cases in water and public law litigation.

One recent trend in the case law has concerned diffuse agricultural pollution – that is, cumulative contamination of water (and soil and air) caused by the movement of pollutants from farmland. In a very short space of time of around 2 or 3 years, there has been a mass of litigation focussed on the production of manure, deposition on land, and runoff into water. Those cases include…

National Farmers’ Union v Herefordshire Council [2025] EWHC 536 (Admin)

The NFU challenged the council’s Minerals and Waste Local Plan (MWLP), Policy W3 of which required that any application for planning permission for a new agricultural livestock unit should include detailed plans showing how the manure it created would be disposed of without harming the environment. The NFU said that Policy W3 illegitimately sought to extend planning control to agricultural activities because inter alia chicken manure is not ‘waste’ within the meaning of the Waste Framework Directive, but rather is a by-product or faecal matter which did not harm the environment. Lieven J refused the application, finding that the local authority was not bound to restrict its MWLP to ‘waste’ as defined by the Directive, [80]. Even if it did, chicken manure could not be said to be either a by-product or faecal matter that did not harm the environment, as its use as a fertiliser was clearly harming the river network. Therefore, while the chicken manure was in the hands of the industrial poultry unit’s manager, it was waste, [81]–[83].

SSEFRA v Pickering Fishery Association [2025] EWCA Civ 378

The fishing association challenged the Humber River Basin Management Plan essentially on the basis that it was too generic, and not specific to any river basin or district. Upholding the decision of Lieven J, the Court of Appeal held that in order to comply with the Water Framework Directive and the implementing regulations,[4] a ‘programme of measures’ drawn up under regulations 12 and 13 had to identify a programme or scheme of actions for each individual water body in order to achieve the environmental objectives for that body, [192]. That being said, the level of detail to be included in the programme of measures was a matter of judgment for the EA and Secretary of State, [192].

R (Fish Legal) v Environment Agency (AC-2026-LON-000962)

This case concerns the River Wye Diffuse Water Pollution Plan, which was published by the EA in November 2025. It is agreed that the river is polluted, but the dispute is about what the EA is required to do as a result. Fish Legal says that because the EA’s current and proposed measures are unlikely to achieve the required reductions in phosphate pollution, the EA is legally required to identify and assess what additional measures are necessary now, rather than deferring that decision to a later point in time. The case is currently stayed pending alternative dispute resolution, so this is one to watch.

Office for Environmental Protection: recent developments

Alice Puritz-Evans then gave an update from the Office for Environmental Protection (OEP) on Project Belisama: a project monitoring the implementation of environmental law in England and Northern Ireland. It focuses on the Water Framework Directive Regulations and River Basin Management Plans (RBMPs), identifying their effectiveness, gaps, and areas for improvement. The Regulations’ overall aim is for surface water bodies to achieve good status by 2027 (although alternative targets can be set under statutory exemptions).

The state of play is far from ideal. 2019 data showed that 16.3% of surface water bodies were currently in good ecological condition. New data from 2026 showed that number has decreased to 14.3%, showing a decline. The third cycle of RBMPs are therefore projected to fail in meeting their environmental objectives.

So the RBMPs are not working. Why? Well, the OEP’s Report from May 2024[5] identified potential areas of non-compliance with the Regulations. Most importantly, the RBMPs lacked certain and specific measures. This was exactly what the Court of Appeal found in Pickering (see above).

But what exactly can the OEP do about it? Well, the OEP is a statutory body governed by Chapter 2 the Environment Act 2021 (“the 2021 Act”) and its enforcement functions are set out in sections 31 to 41. One of the tools at its disposal is decision notices.

Section 36(1) of the 2021 Act empowers the OEP to give a decision notice to a public authority if it is satisfied, on the balance of probabilities, that the authority has failed to comply with environmental law and it considers that the failure is serious. The decision notice will set out the steps which the OEP considers the authority should take in relation to the failure (s.36(2)). The public authority must respond within 2 months (or later date if specified in the notice) setting out whether they agree that the failure occurred, whether they intend to take the suggested steps, and what other steps (if any) they intend to take.

The real ‘teeth’ of decision notices is found under s.38 of the 2021 Act. That section provides that where the OEP has given a decision notice to a public authority then, once it has received a response or the time period for responding has expired, the OEP may apply to the court for an “environmental review”. That involves the court determining whether the public authority has in fact failed to comply with environmental law, applying the principles applicable on an application for judicial review (s.38(5)). If the court finds non-compliance, it must make a “statement of non-compliance” and may grant any remedy that could be granted by it on a judicial review other than damages (subject to specified conditions) (s.38(6)–(11)). The public authority must then publish a statement that sets out the steps it intends to take in light of the review (s.38(12)).

So what can we take from all of this?

Following the case of Pickering, the OEP has the legal foothold it needs to take enforcement action against generic RBMPs, requiring authorities to ensure they are identifying tailored measures to improve the condition of each water body individually.

Panel discussion

Michael Humphries KC then chaired a panel discussion on a wide range of water resource matters. The panellists were Tom Carpen (Thames Water), Rebecca Clutten (FTB), Tom Henderson (TLT), Claire Nevin (FTB) and Jonathan Welch (FTB).

Key discussion points included:

  • The very hot summer this year has thrown the water resilience challenge into sharp relief, with a projected daily shortfall of 5 billion litres per day by 2055 at current rates. Projects like the White Horse Reservoir near Abingdon, Oxfordshire will help to deliver the required supply, but water companies cannot do it alone. Cooperation with all stakeholders, including people living around the site, is essential. The DCO system is likely to be the best vehicle for delivering these mega-projects efficiently, but its processes – such as high-level hearings focussing on issues far removed from the lived experience of people on the ground – often leave local people feeling like they have not been listened to. That aspect of the DCO process may need changing.
  • Per- and polyfluoroalkyl substances (PFAS), which is a family of around 10,000 synthetic chemicals, are found in everything from Teflon non-stick pans to makeup to medical equipment to menstrual products to waterproof clothing. As a result, they make their way into our food, drinking water and waste water. This is a problem because PFAS are widely accepted to be harmful to human and environmental health, potentially causing decreased fertility, developmental delays and an increased risk of some cancers.[6] In contrast with the EU, the UK does not currently have statutory limits on PFAS in drinking water. The Drinking Water Inspectorate provides non-statutory guidance, and there are also the EIA and environmental permitting regimes, but we await statutory limits – which the Government has committed to consulting on.[7]
  • Front-loading design issues and building good relationships around design can help to accelerate the post-consent delivery of large projects. It is also important to: (1) be careful about making concessions about protective provisions, requirements, etc that moderate what the DCO is intended to do, and (2) predict and address any potential legal challenges that might arise, e.g. considering alternative sites where required.

Daniel Leyva is a barrister at FTB specialising in planning and environmental law.

Footnotes

[1] Independent Water Commission: Final Report (21 July 2025) at p.165 (assets.publishing.service.gov.uk/media/687dfcc4312ee8a5f0806be6/Independent_Water_Commission_-_Final_Report_-_21_July.pdf)

[2] emmaforwycombe.org.uk/news/once-in-a-generation-reforms-for-our-water-system/

[3] [url=http://www.bbc.co.uk/news/articles/cmgrvdxzzk8eo]http://www.bbc.co.uk/news/articles/cmgrvdxzzk8eo[/url]

[4] Water Environment (Water Framework Directive) (England and Wales) Regulations 2017

[5] OEP, A review of implementation of the Water Framework Directive Regulations and River Basin Management Planning in England (May 2024)

[6] US Environmental Protection Agency, Our Current Understanding of the Human Health and Environmental Risks of PFAS ([url=http://www.epa.gov/pfas/our-current-understanding-human-health-and-environmental-risks-pfas]http://www.epa.gov/pfas/our-current-understanding-human-health-and-environmental-risks-pfas[/url])

[7] Policy paper, PFAS Plan: building a safer future together (17 August 2026), Indicative Action 3.6 ([url=http://www.gov.uk/government/publications/pfas-plan/pfas-plan-building-a-safer-future-together]http://www.gov.uk/government/publications/pfas-plan/pfas-plan-building-a-safer-future-together[/url])